23 Nov 2026 · Interior.my design team

IT Company Office Design & Build in Bandar Kinrara, Puchong: 4,500 sq ft

A new 4,500 sq ft office for an IT communications company in Bandar Kinrara, Puchong: 16 workstations, a server room, a monitoring room and bold colour, built in four weeks.

Kinrara puchong, Selangor - Design and build new office – renovation in progress
Past project by the Interior.my team (2012–2014)

An IT communications company took an empty 4,500 sq ft office lot on the second floor in Bandar Kinrara, Puchong, Selangor. We designed and built the whole office, including the wiring and networking, in four weeks.

This project comes from our 2012–2014 archive, when the Interior.my team designed and built interiors on site. Today we design homes and businesses online from your floor plan, and the lessons from these jobs go into every design.

Project at a glance

  • Location: Bandar Kinrara, Puchong, Selangor (2nd floor)
  • Property: New empty office lot
  • Size: About 4,500 sq ft
  • Business: IT communications
  • Spaces: 10-person meeting room, MD room, finance room, accounts room, server room, monitoring room, prayer room, 16 workstations
  • Scope: Design and build: ceiling, flooring, partitions, wiring, networking, carpentry
  • Duration: 4 weeks

The brief

Besides the usual meeting room and director's office, an IT company needs technical rooms: a server room and a monitoring room, plus finance and accounts rooms, a prayer room and 16 workstations, all with power and network points in the right places.

The design

The design uses the company's bold colours on large surfaces: yellow, blue and red walls and colour glass panels, set against grey carpet tiles and wood-look vinyl. Rooms are divided with 12 mm tempered glass, so the open office still gets daylight. A plaster ceiling with a drop edge hides the fluorescent lights for soft, indirect light. The reception counter, made in our factory, carries the company name in 12 mm acrylic letters.

3D view of the Bandar Kinrara office layout

How it was built

  1. Gypsum board partition frames first, so all wiring could be hidden inside the walls
  2. Plaster ceiling frame, then ceiling boards once the ceiling wiring was done
  3. Plaster ceiling light drops for concealed fluorescent lights
  4. Joints filled and plastered, ready for paint
  5. Reception counter built in our factory while site work continued
  6. 12 mm tempered glass partitions
  7. Old walls touched up; the existing ceiling boards painted
  8. Tile floor levelled, then wood-look vinyl tiles and carpet tiles
  9. Reception counter installed, with acrylic lettering at the entrance and on the counter
  10. Colour glass panels on room walls and at the workstations
  11. Cleaning and final touch-up

The finished space

Open office with glass rooms and colour walls
Reception counter in red, built in our factory

Tips for a similar office

  • Build partition frames before closing anything: cables then run hidden inside the walls instead of in surface trunking.
  • Make joinery such as a reception counter off site, in parallel with the site work, to save days.
  • Plan the server room's power, cooling and access before the layout is final.
  • Brand colours work best on a few large surfaces, with neutral floors and ceilings around them.

Planning a similar office?

You no longer need a site team to get a professional design. Send us your floor plan and Interior.my designs your office online: a furnished layout to scale, 3D renders, materials and a budget. Start your design, or see how we design office interiors.

More from our project archive:

Questions

What rooms does an IT company office need?

This 4,500 sq ft office has a 10-person meeting room, an MD room, finance and accounts rooms, a server room, a monitoring room, a prayer room and 16 workstations.

How do you hide cables in an office?

Here the gypsum board partition frames went up first, so all power and network cables ran inside the walls before the boards closed them.

How long does a 4,500 sq ft office fit-out take?

This one took four weeks, with the reception counter built in our factory at the same time as the site work.