A brake pad manufacturer in Beranang, Selangor, came back to us three times: first for its factory office and canteen, then for a large steel awning, and then for a new double-storey laboratory office built inside the factory. Together they show what a factory needs beyond the production floor.
This project comes from our 2012–2014 archive, when the Interior.my team designed and built interiors on site. Today we design homes and businesses online from your floor plan, and the lessons from these jobs go into every design.
Project at a glance
- Location: Beranang, Semenyih, Selangor
- Business: Manufacturer of vehicle brake pads
- Project 1: Factory office, reception, meeting room and canteen with kitchen for 150 people: about 5,000 sq ft, 4 weeks
- Project 2: Metal deck awning, 160 ft x 28 ft: engineering design and build, 1 week
- Project 3: New double-storey laboratory office, about 4,500 sq ft, with its own concrete structure: 2 months
The brief
The first job covered about 5,000 sq ft on the ground floor of the existing factory: a reception, a 10-person meeting room, an office for 12 workstations, separate prayer rooms for men and women, and a canteen with its own kitchen for 150 people. Next came a covered outdoor area, and finally laboratory, R&D and testing rooms with offices above.
The design
Office and canteen. Old floor tiles and screed were removed and replaced with 2' x 2' floor tiles; the kitchen got 1' x 2' wall tiles and a colour glass wall that wipes clean. The meeting room and reception have aluminium glass partitions and a plaster ceiling, and the company logo in 12 mm acrylic.
Awning. A 160 ft x 28 ft metal deck awning, engineered and installed in a week, gives the factory a covered outdoor area.
Laboratory office. The biggest job: a new double-storey structure inside the factory. We cut and removed the old concrete floor, poured a new reinforced slab, built concrete columns and a first-floor slab, then fitted it out with gypsum and glass partitions, a frameless tempered glass front, a spiral staircase to the testing room, polished tiles upstairs and a PU-coated floor below.

How it was built
- Canteen and office: old tiles and screed removed, new screed and trunking, 2' x 2' floor tiles
- Aluminium glass partitions, plaster ceiling and gypsum partitions; air-conditioning and paint
- Canteen kitchen: colour glass wall, cooking hob and exhaust ducting; wallpaper in the dining area
- Awning: main truss marked out, steel frame lifted by crane, metal deck fixed
- Laboratory: hoarding, existing 8-inch concrete floor cut and removed, new lean concrete, steel mesh and poured slab
- Concrete columns and first-floor slab on temporary scaffolding
- Metal frames for gypsum and glass partitions, suspended ceiling and wiring
- Frameless tempered glass front, metal side staircase and spiral staircase to the testing room
- Polished 2' x 2' tiles upstairs, PU floor coating downstairs
The finished space





Tips for a similar factory
- A factory canteen needs surfaces that survive daily cleaning: floor tiles, wall tiles and colour glass behind the cooking area.
- Plan prayer rooms for men and women from the start; they need their own space near the office.
- A new room inside a factory may need its own structure: concrete slab, columns and an engineer's design.
- Keep the factory running: hoarding around the work area keeps dust and people apart.
Planning a similar factory?
You no longer need a site team to get a professional design. Send us your floor plan and Interior.my designs your factory online: a furnished layout to scale, 3D renders, materials and a budget. Start your design, or see how we design factory interiors.
More from our project archive:
Questions
What does a factory office fit-out include?
In this Beranang factory: a reception, a 10-person meeting room, an office for 12 workstations, prayer rooms for men and women, and a canteen with a kitchen for 150 people, in about 5,000 sq ft.
Can you build a laboratory office inside an existing factory?
Yes. Here we cut out the old concrete floor, poured a new reinforced slab, built concrete columns and a first-floor slab, then fitted out lab, R&D and testing rooms with offices above. It took two months.
How long does a large steel awning take to install?
This 160 ft x 28 ft metal deck awning took about a week, including lifting the steel frame into place by crane.